We have compiled a list of manufacturers, distributors, product information, reference prices, and rankings for Underground continuous wall removal work.
ipros is IPROS GMS IPROS One of the largest technical database sites in Japan that collects information on.

Underground continuous wall removal work - List of Manufacturers, Suppliers, Companies and Products

Underground continuous wall removal work Product List

1~2 item / All 2 items

Displayed results

[Construction Example] Inzai City, Chiba Prefecture - Underground Continuous Wall Removal Work at New Construction Site

Please leave ground improvement work and ground surveys to us! An example of underground continuous wall removal.

We would like to introduce a case of underground obstacle removal that we conducted. This was carried out at a new construction site in Inzai City, Chiba Prefecture. Using the SR-45 multi-drill rig, we removed a cement milk and H-steel underground continuous wall through the multi-drilling method. For more details about the case, please check the related link. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal at New Construction Site in Inzai City, Chiba Prefecture ■ Construction Date: February 8, 2020 ■ Location: Inzai City, Chiba Prefecture ■ Details: Core material H400×200, GL-16.0m *For more information, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration

[Construction Case] Removal of Underground Continuous Walls in Niiza City, Saitama Prefecture

Using our original special gloves! A case of underground continuous wall removal in an underground space.

We would like to introduce a case of underground obstacle removal conducted by our company. In Niiza City, Saitama Prefecture, we lowered the main machine, the SR-45 multi-drill, to the second basement level and performed the removal of the underground continuous wall in the underground space. Using our original special grab, we removed the soil cement of the continuous wall and the H-beams measuring 400×200 using the multi-drill method. Finally, we divided the site construction piles into four parts for removal. 【Case Overview】 ■ Project Name: Underground Continuous Wall Removal Project, Niiza City, Saitama Prefecture ■ Construction Date: August 11, 2020 ■ Location: Niiza City, Saitama Prefecture *For more details, please download the PDF from the related link or contact us.

  • others

Added to bookmarks

Bookmarks list

Bookmark has been removed

Bookmarks list

You can't add any more bookmarks

By registering as a member, you can increase the number of bookmarks you can save and organize them with labels.

Free membership registration